Free visual project calculator

Post Hole Concrete Calculator

Estimate concrete for round post holes using the hole diameter, concrete depth and number of holes. PlanDIYBuild returns total volume plus common bag-size equivalents for fence, deck and mailbox posts.

PlanDIYBuild visual guide

Post hole concrete

See how hole diameter, hole depth, number of holes and extra / waste define the concrete quantity for post holes.

PlanDIYBuild post hole concrete guide showing hole diameter, hole depth, number of holes and extra or waste allowance
Units
Total concrete2.59 ft³
80-lb bags5 bags
60-lb bags6 bags
40-lb bags9 bags
PROJECT VISUALIZATION

Post-hole concrete section

Live project view · auto-fit
Ø 12 in36 in deep1 hole
PROJECT TAKEOFF

What you'll need

Key purchase quantities from the same complete BOM used below.

580-lb concrete bags

The preview and copied list come from the shared BOM. Planning estimate — verify product sizes, structural requirements and local conditions before purchasing.

PURCHASE PLAN

Materials & tools

Your project quantities with practical planning prices.

Materials to buy

5 80-lb concrete bagsConcrete$32.50$6.50 / bag · estimated planning price

Tool & supply plan

Required / common
✓Tape measureLayout · estimated $12.00 purchase cost
✓Mason line / string lineLayout · estimated $8.00 purchase cost
✓Line levelLayout · estimated $7.00 purchase cost
✓Circular sawForms · estimated $90.00 purchase cost
✓Drill / impact driverForms · estimated $120.00 purchase cost
✓ShovelExcavation · estimated $28.00 purchase cost
✓WheelbarrowMaterial handling · estimated $125.00 purchase cost
✓Screed boardFinishing · estimated $20.00 purchase cost
✓Concrete floatFinishing · estimated $35.00 purchase cost
✓Concrete trowelFinishing · estimated $25.00 purchase cost
Specialty / rent or buy
✓Hand tamper or plate compactorBase preparation · estimated $75.00 rental cost
✓Concrete mixing tub or mixerMixing · estimated $65.00 rental cost
✓Hoe or concrete mixerMixing · estimated $65.00 rental cost
Consumables / safety
✓Safety glassesPPE · estimated $12.00 purchase cost
✓Alkali-resistant glovesPPE · estimated $18.00 purchase cost
✓Rubber bootsPPE · estimated $40.00 purchase cost

Estimated specialty rentals: $205.00

Estimated consumables / PPE: $70.00

Incremental project spend: $275.00

Common tools if starting from scratch: $470.00

Buy every tool / supply from scratch: $1,555.00

Tool prices are planning estimates. Confirm current prices, the exact installation method, manufacturer instructions and safety requirements before purchasing or renting.

Pricing: material subtotal $32.50 + tools / rentals $275.00. Project total $312.05 uses PlanDIYBuild planning prices. Actual retailer prices vary by product, store and location.
ESTIMATED PROJECT COST

$196–$428

Likely project range · 54% estimate confidence

Open full budget in MyBuild →
Materials$33
Labor$0
Tools / rentals$275
Project total$312

Materials use PlanDIYBuild U.S. planning estimates. Retailer prices vary by product, store and location. Tools / rentals are planning estimates.

Cost assumptions & priced materials
5 × $6.50 — 80-lb concrete bags · Estimated planning price · US regional fallback$33
Estimated specialty rentals$205
Estimated consumables / PPE$70
Common tools if not already owned$470

Tool amounts are broad planning allowances, not current retailer or rental quotes. The incremental project-spend allowance assumes common tools are already owned and adds specialty rentals plus consumables / PPE. Reusable tools and rentals are shared across a combined saved-project budget when the same tool appears more than once; consumables / PPE remain budgeted per project. Buy-all totals use purchase allowances for every tool rather than rental allowances. Actual availability, tax, delivery, site conditions and labor may differ.

Need more detail?

Check the method or common questions

Method, formula & assumptions

Concrete estimating basics

Formula: Volume = length × width × thickness. PlanDIYBuild converts thickness from inches to feet, then converts cubic feet to cubic yards. Bag estimates use the stated approximate yield for each common bag size.

Worked example: Example: a 10 × 12 ft slab at 4 in thick has 40 ft³ of geometric volume before extra material. Divide cubic feet by 27 to convert to cubic yards.

Before you buy: Concrete projects commonly need extra material for grade variation, spillage and imperfect measurements. Use the adjustable extra-material percentage and confirm the yield printed on the mix you plan to buy.

Post Hole Concrete Calculator FAQ

Should I order exactly the calculated amount?

Usually no. Real forms, subgrade and measurements are rarely perfect. The calculator lets you add extra material so you can plan above the geometric minimum.

Are concrete bag yields exact?

No. Bag yield varies by product. Treat the displayed bag counts as planning estimates and verify the yield printed on the specific mix before buying.

Keep planning

Continue your Concrete project

Use the Concrete planning hub for related calculators and quick-reference guides.

Open Concrete Planning Hub →

Project shopping

Useful products for this project

Photos are representative examples of the item type—not the exact Amazon listing. Amazon links open current search results so you can compare brands, sizes and prices.

Independent recommendationsPlanDIYBuild does not rank products by commission, and calculator results do not change based on affiliate relationships.As an Amazon Associate, PlanDIYBuild earns from qualifying purchases. Verify product dimensions, compatibility, coverage and manufacturer instructions before purchasing.
PlanDIYBuild reference

Useful enough to share. Clear enough to cite.

Share this page or copy a simple citation. Calculation assumptions and source practices are documented in our methodology.

Methodology & sources